Departments



Articles

Less

UF/IFAS Shellfish Aquaculture Extension: Horseshoe Crabs in Cedar Key
March 17th, 2013

Woman`s Club News: CK Woman`s Club & Deja Vu Luncheon Fashion Show: A Success!
March 15th, 2013

News: Cedar Key Pirates in Paradise Unveil a New Logo
March 15th, 2013

Announcements: Easter Egg Hunt Hosted by the Faraway Inn
March 13th, 2013

Public Notices: CITY OF CEDAR KEY PUBLIC SERVICE ANNOUNCEMENT
March 12th, 2013

Law Enforcement News: Levy County Arrest Report 3/11/2013
March 12th, 2013

Public Notices: CITY OF CEDAR KEY PUBLIC SERVICE ANNOUNCEMENT
March 12th, 2013

Arts and Entertainment: "Little Shop of Horrors" HELD OVER FOR ONE MORE WEEK!
March 12th, 2013

News: Cedar Key Observes 101st International Women`s Day
March 11th, 2013

Outdoors: FWC restricts boating on Suwannee River`s Zone 4
March 11th, 2013

Library: This Week`s Library Program: Storyteller Kathy Dobronyl to Portray Florida Cracker History
March 11th, 2013

News: Linda Dale`s Granddaughter Moves Up the Academic Ladder, With Praise
March 10th, 2013

Arts and Entertainment: Cedar Keyhole Artist of the Month: Connie Starks
March 10th, 2013

Arts and Entertainment: CEDAR KEY ART FESTIVAL JUDGE SELECTED
March 10th, 2013

Arts and Entertainment: Cedar Key Poets 2013 Reading
March 9th, 2013

More

FLORIDA DEPT OF TRANSPORTATION SUPPORTS CEDAR KEY PROJECTS

FLORIDA DEPT OF TRANSPORTATION SUPPORTS CEDAR KEY PROJECTS

Margy VanLandingham

The Florida Department of Transportation has included Cedar Key in its sights for the next several years and elaborated on their plans at a recent meeting.


District Two of FDOT covers the north central part of Florida, including Levy County, and has approved the following construction projects for the near term: replacement of the bridge to the airport over Daughtry Bayou, replacement of the bridge to the airport over Lewis Pass, replacement of the bridge to Dock Street, repairs to the #3 Channel bridge, as well as, various airport runway and support projects.


In addition, FDOT has indicated that there is funding for a pedestrian/cycling or "sidewalk" project between the #3 and #4 bridges on State Road 24 coming into Cedar Key. The City of Cedar Key Commission has generally been supportive of that project, too.


On Thursday, November 29, 2012, FDOT held its Five Year Work Program hearing for 12 of its 18 counties (including Levy) to receive public input or inquiries on transportation projects that are approved or pending at its Lake City office. Several Cedar Key residents were in attendance and had a number of questions. Jordan Greene, District Engineer, was able to answer most of them.


For most of the Cedar Key projects, the FDOT will oversee the design and construction themselves, because most or all of the funding falls entirely within their right-of-way or jurisdiction. But, for the sidewalk project, there is considerable discretion and fluidity moving forward. Other key points include:


* The Florida Department of Transportation believes that the City of Cedar Key has formally approved this project.


* The Florida DOT would prefer to build this sidewalk/pathway on the eastern/southern side of SR 24 as they own more of the right-of-way on this side of the road. But this would likely require crosswalks (or more crosswalks) across SR 24 than other alternatives.


* The Florida DOT grant under which this potential project would be constructed is not allowed to purchase any right-of-way property, but the Department is allowed to accept donations of right-of-way property by affected/interested owners.


* The City of Cedar Key retains substantial say over the design and implementation of the project, but these matters should be settled before the finalization of the project plans or contrac, if possible. Additionally, the City could reject the project at any stage of design or negotiation.


* The Florida DOT "Plans and Preparation Manual" provides all of the detailed DOT specifications for sidewalk/pathway projects, is available on online, and controls what physical and safety requirements are mandated for various project designs: sidewalks, boardwalks, bikeways, etc.

* After safety, another important consideration by the FDOT when designing facilities for pedestrians and bicycles is the environment. First would be the avoidance of any environmental destruction. The next consideration would be minimization of damage to the environment. And lastly would be environmental mitigation.


* The Florida DOT staff members have not yet determined the design and specifications for the potential "sidewalk" between Bridget #3 and #4, are open to various suggestions or configurations, including non-hardened options like boardwalks or bikeways, and await further communication from the City and from the firm chosen to represent the City in the "sidewalk" project.


* Mr. Jordan Green and members of his staff are available to visit the City of Cedar Key to assist or clarify or explain Department of Transportation policies and procedures in a workshop or other desired format.


You can find more information online at: dot.state.fl.us.

Click for printer friendly version

Email this article to a friend

 

 

© 2013
Cedar Key News

cedarkeynews@gmail.com