Departments



Articles

Less

Announcements: Levy County Arrest Report 10/31/2011
November 1st, 2011

Announcements: Those Crazy Jumping Sturgeon What’s It All About?
October 31st, 2011

Announcements: Miss Betty Walker, Executive Director of LARC, addresses the Cedar Key Lions Club
October 29th, 2011

Announcements: SPREAD THE WORD: SATURDAY IS HALLOWEEN IN DOWNTOWN CEDAR KEY; NO TRICK-OR-TREATING ON MONDAY!
October 27th, 2011

Announcements: New Classroom Building at the Lower Suwannee NWR
October 27th, 2011

Announcements: Cedar Key Author Releases Latest Book
October 26th, 2011

Announcements: SHINE representatives will be at the Cedar Key Public Library on Wednesday, October 26
October 25th, 2011

Announcements: BOOK CLUB NEWS
October 24th, 2011

Announcements: Learn a hobby at free Women’s Fishing Clinic in Crystal River
October 24th, 2011

Announcements: Rare Moth Seen in Cedar Key
October 22nd, 2011

Announcements: Job Fair in Bronson
October 19th, 2011

Announcements: COLIN DALE REPLACES JIM HOY AS CEDAR KEY NEWS MANAGING EDITOR
October 19th, 2011

Announcements: More Festival Pics and Info
October 19th, 2011

Announcements: FESTIVAL PARADE WINNERS
October 18th, 2011

Announcements: LEVY COUNTY VALUE ADJUSTMENT BOARD HEARINGS
October 18th, 2011

More

State Road 24 in western Alachua County to be resurfaced beginning Monday

State Road 24 in western Alachua County to be resurfaced beginning Monday

Laurie Windham

Gainesville -The resurfacing of State Road 24 in western Alachua County will incorporate changes in the way a project is designed by the Florida Department of Transportation (FDOT), thus reducing the pre-construction costs and potentially saving the state thousands of dollars. This `smart plan` concept will be used on routine projects such as the resurfacing of SR 24 between the City of Archer and the Levy County line and will save money by reducing surveying and construction plan production.

This concept can be used for projects that already meet FDOT design standards and roadways that only need to be resurfaced or repaired with minor reconstruction. The goal of this new concept is to reduce surveying costs and design construction plans more efficiently by producing more simplified construction plans.

The plans were reduced from 120 sheets to 15 sheets which are provided to the FDOT`s contractor in order to construct the improvements, similar to a set of house plans.

Crews will begin Monday with drainage and concrete work throughout the 2.7 mile project. Once this is completed, they will remove and replace the top two inches of asphalt which is expected to begin by mid-August.

The road will also be widened just west of the old Alachua County landfill to accommodate a 4-foot bike lane between the travel lane and a right turn lane.
Motorists can expect daytime lane closures weekdays after 8:30 a.m. with flaggers directing traffic. Some driveways may be affected while crews work on drainage pipes. Work will not be allowed Monday, September 3 for the Labor Day holiday or on Saturdays of home University of Florida football games in anticipation of increased traffic.

FDOT has hired V.E. Whitehurst & Sons, Inc. of Williston to complete the work for $985,717. 27. The contractor has about three months to complete the work, depending on weather conditions and other unexpected circumstances.
This section of State Road 24 was last resurfaced and widened in 1997. An average of 6,500 vehicles travels this section of roadway each day.

For additional information regarding this project or other FDOT projects around Northeast Florida, visit www.nflroads.com or call 800-475-0044. The public can also follow this project and other projects in Northeast Florida by following the FDOT on Twitter @MyFDOT_NEFL or http://twitter.com/MyFDOT_NEFL.

Click for printer friendly version

Email this article to a friend

 

 

© 2013
Cedar Key News

cedarkeynews@gmail.com