Departments



Articles

Less

City Documents: Agenda - Cedar Key City Commission Feb.7
February 7th, 2006

City Documents: Unapproved Minutes of City Commission Meeting January 17, 2006
January 20th, 2006

City Documents: Historic Preservation/Architectural Review Board Announces Opening for Citizen Volunteer
January 20th, 2006

City Documents: City Commission Agenda January 17, 2006
January 17th, 2006

City Documents: Commission Minutes (Uncorrected)
January 6th, 2006

City Documents: LPA Meeting Jan. 5
December 21st, 2005

City Documents: Minutes of City Meetings Dec. 14
December 21st, 2005

City Documents: Notices of Rehearings
December 12th, 2005

City Documents: Notice of Quasi-Judicial Hearing
December 12th, 2005

City Documents: City Commission Meeting December 6
December 9th, 2005

City Documents: Notice of Proposed Ordinance 399 Enactment
December 7th, 2005

City Documents: Notice of Proposed Ordinance 400 Enactment
December 7th, 2005

City Documents: CRA Meets December 14
December 7th, 2005

City Documents: Agenda for December 14 City Commission Meeting
December 7th, 2005

City Documents: Planning Meeting Tuesday
November 28th, 2005

More

Road and Water Main Work Set for Whiddon Avenue Area

Road and Water Main Work Set for Whiddon Avenue Area

City Documents

WHIDDON AVENUE WATER MAIN WORK STARTED

The existing undersized and degraded 6" water main running along Whiddon Avenue between State Road 24 and Gulf Boulevard will be replaced between December 16 and Christmas Eve.

Using a trenchless technology called pipe bursting the contractor will pull the new 8" water main thru the existing 6" pipe. The existing smaller diameter pipe will be burst in place with a cone-shaped cutting tool with the new 8" pipe pulled behind it.

Some advantages of this method include faster construction times, minimizing the need for open trenches and much less customer disruption. The new water main will increase the gallons-per-minute flow, quality of the water and provide addition fire protection. Additionally, new fire hydrants will be installed in areas that did not have adequate pro-tection.


The Contractor will be notifying customers along Whiddon Avenue that they will have an interruption in their water service at some point between December 15 and December 24. The Contractor will go door to door with information at lease one day in advance, notifying customers of the service interruption.


Customers along Whiddon Avenue will experience an interruption in water service as water lines are temporarily shut down and new lines connected. The duration of the interruption may last between 8 Am and 3 PM


For the safety of school and local traffic, Whiddon Avenue will be temporary closed between State Road 24 and "G" Street during the day on Saturday, December 18. It will reopen Saturday evening. Traffic all along Whiddon will be slowed, and temporary lane closures will occur during construction.


The Cedar Key CRA and Cedar Key Water & Sewer District will be monitoring and assisting as needed. The direct number to the CRA office is 352-543-6539. If not in the office, Greg Lang can be reached at 352-222-8372.

Click for printer friendly version

Email this article to a friend

 

 

© 2013
Cedar Key News

cedarkeynews@gmail.com