Departments



Articles

Less

City Documents: City Commission Agenda
September 2nd, 2005

City Documents: CRA Interviews
September 2nd, 2005

City Documents: CRA Interview Questions
September 2nd, 2005

City Documents: Notice of Hearing
September 2nd, 2005

City Documents: The Comprehensive Plan is Coming!
August 15th, 2005

City Documents: Notice of Proposed Resolution Enactments
August 15th, 2005

City Documents: Minutes of FRDAP Hearing
August 5th, 2005

City Documents: Schedule for Budget Hearings
August 5th, 2005

City Documents: Public Hearing
July 29th, 2005

City Documents: City Commission Meeting Minutes
July 25th, 2005

City Documents: LPA Meeting Schedule for August
July 21st, 2005

City Documents: Annexation Ordinance
July 11th, 2005

City Documents: Agenda for July 5, 2005
July 1st, 2005

City Documents: City of Cedar Key Community Redevelopment Agency
July 1st, 2005

City Documents: City Commission Agenda
June 21st, 2005

More

Road and Water Main Work Set for Whiddon Avenue Area

Road and Water Main Work Set for Whiddon Avenue Area

City Documents

WHIDDON AVENUE WATER MAIN WORK STARTED

The existing undersized and degraded 6" water main running along Whiddon Avenue between State Road 24 and Gulf Boulevard will be replaced between December 16 and Christmas Eve.

Using a trenchless technology called pipe bursting the contractor will pull the new 8" water main thru the existing 6" pipe. The existing smaller diameter pipe will be burst in place with a cone-shaped cutting tool with the new 8" pipe pulled behind it.

Some advantages of this method include faster construction times, minimizing the need for open trenches and much less customer disruption. The new water main will increase the gallons-per-minute flow, quality of the water and provide addition fire protection. Additionally, new fire hydrants will be installed in areas that did not have adequate pro-tection.


The Contractor will be notifying customers along Whiddon Avenue that they will have an interruption in their water service at some point between December 15 and December 24. The Contractor will go door to door with information at lease one day in advance, notifying customers of the service interruption.


Customers along Whiddon Avenue will experience an interruption in water service as water lines are temporarily shut down and new lines connected. The duration of the interruption may last between 8 Am and 3 PM


For the safety of school and local traffic, Whiddon Avenue will be temporary closed between State Road 24 and "G" Street during the day on Saturday, December 18. It will reopen Saturday evening. Traffic all along Whiddon will be slowed, and temporary lane closures will occur during construction.


The Cedar Key CRA and Cedar Key Water & Sewer District will be monitoring and assisting as needed. The direct number to the CRA office is 352-543-6539. If not in the office, Greg Lang can be reached at 352-222-8372.