Departments



Articles

Less

City Documents: Joint Workshop Meeting Minutes March 17, 2005
March 22nd, 2005

City Documents: City Commission Meeting Minutes of March 15, 2005
March 21st, 2005

City Documents: Cedar Key Planning Board Meeting Minutes of March 8, 2005
March 14th, 2005

City Documents: City Commission Agenda
March 11th, 2005

City Documents: City Commission Meeting Minutes March 1, 2005
March 7th, 2005

City Documents: City Commission Agenda for March 1, 2005
February 23rd, 2005

City Documents: Architectural/Historical Review Petition No. 2005-09
February 23rd, 2005

City Documents: Architectural/Historical Review Petition No. 2005-11
February 23rd, 2005

City Documents: Architectural/Historical Review Petition No. 2005-10
February 23rd, 2005

City Documents: City of Cedar Key Community Redevelopment Agency - Director`s Job
February 23rd, 2005

City Documents: City Commission Meeting Minutes February 15, 2005
February 18th, 2005

City Documents: CRA Minutes February 15, 2005
February 17th, 2005

City Documents: Minutes of Special Meeting City of Cedar Key February 3, 2005
February 12th, 2005

City Documents: City Commission Agenda February 15, 2005
February 12th, 2005

City Documents: CRA Agenda February 15 2005
February 12th, 2005

More

Road and Water Main Work Set for Whiddon Avenue Area

Road and Water Main Work Set for Whiddon Avenue Area

City Documents

WHIDDON AVENUE WATER MAIN WORK STARTED

The existing undersized and degraded 6" water main running along Whiddon Avenue between State Road 24 and Gulf Boulevard will be replaced between December 16 and Christmas Eve.

Using a trenchless technology called pipe bursting the contractor will pull the new 8" water main thru the existing 6" pipe. The existing smaller diameter pipe will be burst in place with a cone-shaped cutting tool with the new 8" pipe pulled behind it.

Some advantages of this method include faster construction times, minimizing the need for open trenches and much less customer disruption. The new water main will increase the gallons-per-minute flow, quality of the water and provide addition fire protection. Additionally, new fire hydrants will be installed in areas that did not have adequate pro-tection.


The Contractor will be notifying customers along Whiddon Avenue that they will have an interruption in their water service at some point between December 15 and December 24. The Contractor will go door to door with information at lease one day in advance, notifying customers of the service interruption.


Customers along Whiddon Avenue will experience an interruption in water service as water lines are temporarily shut down and new lines connected. The duration of the interruption may last between 8 Am and 3 PM


For the safety of school and local traffic, Whiddon Avenue will be temporary closed between State Road 24 and "G" Street during the day on Saturday, December 18. It will reopen Saturday evening. Traffic all along Whiddon will be slowed, and temporary lane closures will occur during construction.


The Cedar Key CRA and Cedar Key Water & Sewer District will be monitoring and assisting as needed. The direct number to the CRA office is 352-543-6539. If not in the office, Greg Lang can be reached at 352-222-8372.

Click for printer friendly version

Email this article to a friend

 

 

© 2013
Cedar Key News

cedarkeynews@gmail.com