Departments



Articles

Less

City Documents: Unapproved Minutes of City Commission Meeting 11/15/05
November 18th, 2005

City Documents: Notice of Quasi-Judicial Hearing
November 1st, 2005

City Documents: Minutes of City Commission Meeting 10-18-05
November 1st, 2005

City Documents: City Seeks Paving Bids
October 25th, 2005

City Documents: Notice of Quasi-Judicial Hearing
October 25th, 2005

City Documents: Notice of Proposed Ordinance 395 Enactment
October 21st, 2005

City Documents: Notice of Proposed Ordinance 394 Enactment
October 21st, 2005

City Documents: City Commission Meeting Agenda
October 13th, 2005

City Documents: Notice of Quasi-Judicial Hearing
October 12th, 2005

City Documents: Commission Meeting Minutes, Oct. 4, 2005
October 7th, 2005

City Documents: Notice of Quasi Judicial Hearing
September 27th, 2005

City Documents: Notice of Public Hearing
September 20th, 2005

City Documents: Minutes of City Commission Meeting
September 16th, 2005

City Documents: City Commission Agenda September 20, 2005
September 14th, 2005

City Documents: Notice of Hearing
September 6th, 2005

More

Water System and Streets Work Continues

Water System and Streets Work Continues

City Documents

During the week of January 3rd water main and water services replacement will be completed on Whiddon Avenue. Between January 4th and 5th work will begin on Second Street between "D" and "F" Streets.

The Contractor will be notifying customers on Second Street between "D" & "F" Streets that they will have an interruption in their water service at some point between January 5th and January 14th.

Using a trenchless technology called pipe bursting the contractor will pull the new 8" water main thru the existing 6" pipe. The existing smaller diameter pipe will be burst in place with a cone shaped cutting tool with the new 8" pipe pulled behind it. Some advantages of this method include faster construction times and minimizing the need for open trenches.


The new water main is pre-chlorinated and tested prior to installation allowing the system to be put into service the same day it is installed. The new water main will increase the gallons per minute flow, quality of the water and provide addition fire protection. Additionally, new fire hydrants will be installed in areas that did not have adequate protection.

Water main replacement and streets reconstruction will not occur on the balance of Second Street (between "D" and Depot Streets) until after the Spring Arts Festival in April.

Street reconstruction and resurfacing work will continue thru January in the downtown residential areas. Some streets will have temporary closures and or detours, please drive carefully.