Departments



Articles

Less

City Documents: City Commission Budget Meeting IV - September 23, 2004 Minutes
September 27th, 2004

City Documents: City Commission Budget Workshop Minutes
September 26th, 2004

City Documents: City Commission Meeting Minutes of September 21, 2004
September 23rd, 2004

City Documents: Architectural/Historical Committee Review - Petition 2004-13
September 21st, 2004

City Documents: City Commission Budget Workshop Minutes
September 20th, 2004

City Documents: Notice of Quasi-Judicial Hearing Petition No. 2004-09
September 17th, 2004

City Documents: Notice of Quasi-Judicial Hearing Petition No. 2004-10
September 17th, 2004

City Documents: Architectural/Historical Review Committee Meeting - Petition 2004-11
September 17th, 2004

City Documents: Architectural/Historical Review Meeting - Petition 2004-12
September 17th, 2004

City Documents: Notice of Proposed Ordinance Enactment - 376
September 16th, 2004

City Documents: Notice of Proposed Ordinance Enactment - 377
September 16th, 2004

City Documents: City Commission Agenda for September 21, 2004
September 16th, 2004

City Documents: LPA Meeting Minutes for 9/01/04
September 11th, 2004

City Documents: Gulf Trail Meeting
September 8th, 2004

City Documents: Emergency Meeting
September 1st, 2004

More

Road and Water Main Work Set for Whiddon Avenue Area

Road and Water Main Work Set for Whiddon Avenue Area

City Documents

WHIDDON AVENUE WATER MAIN WORK STARTED

The existing undersized and degraded 6" water main running along Whiddon Avenue between State Road 24 and Gulf Boulevard will be replaced between December 16 and Christmas Eve.

Using a trenchless technology called pipe bursting the contractor will pull the new 8" water main thru the existing 6" pipe. The existing smaller diameter pipe will be burst in place with a cone-shaped cutting tool with the new 8" pipe pulled behind it.

Some advantages of this method include faster construction times, minimizing the need for open trenches and much less customer disruption. The new water main will increase the gallons-per-minute flow, quality of the water and provide addition fire protection. Additionally, new fire hydrants will be installed in areas that did not have adequate pro-tection.


The Contractor will be notifying customers along Whiddon Avenue that they will have an interruption in their water service at some point between December 15 and December 24. The Contractor will go door to door with information at lease one day in advance, notifying customers of the service interruption.


Customers along Whiddon Avenue will experience an interruption in water service as water lines are temporarily shut down and new lines connected. The duration of the interruption may last between 8 Am and 3 PM


For the safety of school and local traffic, Whiddon Avenue will be temporary closed between State Road 24 and "G" Street during the day on Saturday, December 18. It will reopen Saturday evening. Traffic all along Whiddon will be slowed, and temporary lane closures will occur during construction.


The Cedar Key CRA and Cedar Key Water & Sewer District will be monitoring and assisting as needed. The direct number to the CRA office is 352-543-6539. If not in the office, Greg Lang can be reached at 352-222-8372.

Click for printer friendly version

Email this article to a friend

 

 

© 2013
Cedar Key News

cedarkeynews@gmail.com