Departments



Articles

Less

City Documents: Agenda Redevlopment Meeting August 17, 2004
August 13th, 2004

City Documents: Gulf Trail Meeting Scheduled for August 9, 2004
August 7th, 2004

City Documents: Cedar Key Commission Minutes August 3, 2004
August 7th, 2004

City Documents: Cedar Key Planning Board Minutes of July 22, 2004
July 28th, 2004

City Documents: City Commission Agenda for August 3, 2004
July 28th, 2004

City Documents: Community Special Needs List Update in Progress
July 27th, 2004

City Documents: Date Change for Gulf Trail Advisory Meeting
July 23rd, 2004

City Documents: Commission Meeting Agenda for July 20, 2004
July 15th, 2004

City Documents: C.R.A. Meeting Agenda for July 20, 2004
July 15th, 2004

City Documents: LPA Meeting
July 14th, 2004

City Documents: Dock Street Closure
July 8th, 2004

City Documents: Commencement of Marina Basin Dredge
July 8th, 2004

City Documents: Marina Dredging to Begin
July 2nd, 2004

City Documents: City Commission Agenda for July 6, 2004
July 2nd, 2004

City Documents: Dock Street Closure Notice
June 25th, 2004

More

Road and Water Main Work Set for Whiddon Avenue Area

Road and Water Main Work Set for Whiddon Avenue Area

City Documents

WHIDDON AVENUE WATER MAIN WORK STARTED

The existing undersized and degraded 6" water main running along Whiddon Avenue between State Road 24 and Gulf Boulevard will be replaced between December 16 and Christmas Eve.

Using a trenchless technology called pipe bursting the contractor will pull the new 8" water main thru the existing 6" pipe. The existing smaller diameter pipe will be burst in place with a cone-shaped cutting tool with the new 8" pipe pulled behind it.

Some advantages of this method include faster construction times, minimizing the need for open trenches and much less customer disruption. The new water main will increase the gallons-per-minute flow, quality of the water and provide addition fire protection. Additionally, new fire hydrants will be installed in areas that did not have adequate pro-tection.


The Contractor will be notifying customers along Whiddon Avenue that they will have an interruption in their water service at some point between December 15 and December 24. The Contractor will go door to door with information at lease one day in advance, notifying customers of the service interruption.


Customers along Whiddon Avenue will experience an interruption in water service as water lines are temporarily shut down and new lines connected. The duration of the interruption may last between 8 Am and 3 PM


For the safety of school and local traffic, Whiddon Avenue will be temporary closed between State Road 24 and "G" Street during the day on Saturday, December 18. It will reopen Saturday evening. Traffic all along Whiddon will be slowed, and temporary lane closures will occur during construction.


The Cedar Key CRA and Cedar Key Water & Sewer District will be monitoring and assisting as needed. The direct number to the CRA office is 352-543-6539. If not in the office, Greg Lang can be reached at 352-222-8372.

Click for printer friendly version

Email this article to a friend

 

 

© 2013
Cedar Key News

cedarkeynews@gmail.com